
Services
We cover the whole technical side of an event: we deliver, rig, work the show and strike. You can also take a single part, lighting only or staging only.
The park is listed below by discipline.
The park lists below are taken from the 2018 inventory. We send a current specification with quantities for the specific project.



Lighting
Moving heads, statics, followspots and light balls. High End Systems Hog III and Hog IV consoles with processors. We program the show in advance and send an operator with the package.
More
- Moving headsClay Paky Alpha Spot 1500 HPE, Alpha Profile 1500, Alpha Beam 1500, Sharpy, Shotlight Wash 1500, A.leda Wash K10; High End Systems Showgun 2.5, Showbeam 2.5, Cyberlight 2.0, Studio Xspot 700, Studio Beam 700
- ConsolesHigh End Systems Hog IV, Hog III, DP 8000 and DP 2000 processors
- StaticsMartin Atomic 3000, Eurolite blinders 2×650, 4×650 and 8×650 W, ARRI Daylight 5000
- FollowspotsRobert Juliat Cyrano 2500 W, Clay Paky Shadow QS-LT 1200 W
- Light ballsSolyarc Air Star 3.7 m and 6 m
- UAE: National Day mapping and the PSL stadium2016
- A club festival at our own arena2015
- Nauryz and the Assembly under canvas2015


- Moving headsClay Paky Alpha Spot 1500 HPE, Alpha Profile 1500, Alpha Beam 1500, Sharpy, Shotlight Wash 1500, A.leda Wash K10; High End Systems Showgun 2.5, Showbeam 2.5, Cyberlight 2.0, Studio Xspot 700, Studio Beam 700
- ConsolesHigh End Systems Hog IV, Hog III, DP 8000 and DP 2000 processors
- StaticsMartin Atomic 3000, Eurolite blinders 2×650, 4×650 and 8×650 W, ARRI Daylight 5000
- FollowspotsRobert Juliat Cyrano 2500 W, Clay Paky Shadow QS-LT 1200 W
- Light ballsSolyarc Air Star 3.7 m and 6 m



Sound
An L-Acoustics KUDO line array with SB218 subs and LA8 amplifiers. That package covers both a hall and an open site. The microphone park is built from Sennheiser, Shure and AKG.
More
- PAL-Acoustics KUDO ×48, SB218 ×32, 115XT HiQ ×20, LA8 amplifiers ×28
- ConsolesYamaha PM5D, Yamaha M7CL, PreSonus StudioLive 24.4.2
- Wireless and microphonesSennheiser G3 300 series, Shure Beta 58, SM58, SM57, SM81, PGX4, AKG C451B and C411, Sennheiser Drum Set 600 series
- Monitoringin-ear systems, ART DI boxes
- DJPioneer DJM-2000 nexus and two CDJ-2000 nexus, Numark CDN 88 Pro
- A club festival at our own arena2015
- Nauryz and the Assembly under canvas2015
- The main stage on the plaza2010


- PAL-Acoustics KUDO ×48, SB218 ×32, 115XT HiQ ×20, LA8 amplifiers ×28
- ConsolesYamaha PM5D, Yamaha M7CL, PreSonus StudioLive 24.4.2
- Wireless and microphonesSennheiser G3 300 series, Shure Beta 58, SM58, SM57, SM81, PGX4, AKG C451B and C411, Sennheiser Drum Set 600 series
- Monitoringin-ear systems, ART DI boxes
- DJPioneer DJM-2000 nexus and two CDJ-2000 nexus, Numark CDN 88 Pro



Video and LED
A Gloshine P5 LED screen for outdoor and indoor use, 140 m² in the park. Christie projectors at 20 000 and 30 000 ANSI work on facades and on large screens. Catalyst and Light-Converse media servers hold the content and the mapping.
More
- LEDGloshine P5, indoor and outdoor, 140 m²
- ProjectorsChristie Roadster S20K SXGA 20 000 ANSI, Christie Roadie HD+ 30K, Roadster lenses for throws from 0.67:1 to 7.3:1
- ControlCatalyst PM V4 DV and Light-Converse media servers, LED processors, Analog Way Pulse2
- Screensfront and rear projection up to 14×8 m, a holographic screen 3×4 m
- UAE: National Day mapping and the PSL stadium2016
- A club festival at our own arena2015
- Nauryz and the Assembly under canvas2015


- LEDGloshine P5, indoor and outdoor, 140 m²
- ProjectorsChristie Roadster S20K SXGA 20 000 ANSI, Christie Roadie HD+ 30K, Roadster lenses for throws from 0.67:1 to 7.3:1
- ControlCatalyst PM V4 DV and Light-Converse media servers, LED processors, Analog Way Pulse2
- Screensfront and rear projection up to 14×8 m, a holographic screen 3×4 m



Truss and stages
We build stages, roofs and ground supports on EuroTruss. The park holds 101×76, 52×52, 50×60 and 35×35 sections in lengths from 1 to 4 metres. We lift with 1 and 2 tonne hoists.
More
- Truss101×76, 52×52, 50×60, 35×35; corner blocks 60×70 and 40×40
- Bases, tops, spacers and blocks for every section
- Hoists1 tonne ×36, 2 tonnes ×8, manual ×12


- Truss101×76, 52×52, 50×60, 35×35; corner blocks 60×70 and 40×40
- Bases, tops, spacers and blocks for every section
- Hoists1 tonne ×36, 2 tonnes ×8, manual ×12





Special effects
Lasers, fog, confetti and water. Glaciator X-Stream low fog lies across the stage instead of rising into the rig. A water screen takes projection straight onto water.
More
- Lasers5000 mW green, RGB, a mirror set and control
- Fog and airGlaciator X-Stream, DF 50 hazers, High End Systems F-100, JEM fans, Wind 1500 wind machines
- Launch effectsconfetti, foam, snow, rain, bubbles, silk, tubes
- Waterwater screen, 3 sets
- A club festival at our own arena2015
- The main stage on the plaza2010
- Astana Küni: LED at Ak Orda and a stage on the water2009




- Lasers5000 mW green, RGB, a mirror set and control
- Fog and airGlaciator X-Stream, DF 50 hazers, High End Systems F-100, JEM fans, Wind 1500 wind machines
- Launch effectsconfetti, foam, snow, rain, bubbles, silk, tubes
- Waterwater screen, 3 sets





Domes
We put up geodesic domes, tented arenas and hangars. A dome becomes a stage, a hall or a pavilion on an open site. Inside it we rig the same lighting, sound and video.
More
- Geodesic domes for events and exhibitions
- Tented arenas, including our own Event Arena
- Hangars and temporary structures
- Full cycleengineering, rigging, on-site service, strike




- Geodesic domes for events and exhibitions
- Tented arenas, including our own Event Arena
- Hangars and temporary structures
- Full cycleengineering, rigging, on-site service, strike

Rigging
Our own rigging crew. Rigging points and hardware, ground supports, flying line arrays, cable runs and patching. We work to the venue's schedule and hand the site back after strike.
More
- Rigging hardware1 and 2 tonne chain hoists, manual chain blocks, slings and rigging hardware
- Structuresbuilding stages, roofs and ground supports on truss
- Patchingcable runs, distribution to each position, testing before rehearsal
- Handoverstrike and returning the site to its original state
- Rigging hardware1 and 2 tonne chain hoists, manual chain blocks, slings and rigging hardware
- Structuresbuilding stages, roofs and ground supports on truss
- Patchingcable runs, distribution to each position, testing before rehearsal
- Handoverstrike and returning the site to its original state
Equipment supply
Besides rental we select and supply equipment for what a venue needs. We agree the specification, deliver the package and commission it. This sits next to rigging: a venue more often needs a permanent installation than a one-off rental.
More
- Selectionitems chosen for the format of the venue and for the work it will cover
- Specificationa list of models and quantities, agreed before purchase
- Deliverydelivery, installation and commissioning of the package
- Selectionitems chosen for the format of the venue and for the work it will cover
- Specificationa list of models and quantities, agreed before purchase
- Deliverydelivery, installation and commissioning of the package

How a project runs
- 01Brief
Venue, date, format, guest count.
- 02Specification and quote
Equipment package, rigging crew, schedule.
- 03Load-in
We arrive early, build, test and rehearse.
- 04Show
We work the site with our own crew.
- 05Strike
We take it down and haul it out.
The full list of questions behind a quote sits on a separate page: the project brief.
Open the briefTell us the venue and the date
Send us the venue, the date and the format. We will price the equipment package and the crew, and give you a figure.

